In a prototype solar thermal power plant, two turbines are installed to [...]
Two General Electric steam turbines are installed in a prototype solar thermal plant.
Download Documents
Steam Turbine Resonance Analysis Case - PDF- 510 KB
Background
Both turbogroups, capable of producing a maximum power of 15 MW, show significant increases in vibration levels when operating at low load which, although remaining within the limits set by ISO 7919-3 standards, are not accepted by the company that will manage the plant, delaying the commissioning of the plant. [...] Continue reading